Olde Tyme Association · Prep Checklist
Fourth Grade Open Day
September 17, 2026 · 9 AM – 1 PM · Heritage Sites at Fairgrounds · 600+ children expected
Quick budget reference
| Take-home souvenirs | $900–$1,200 |
| Port-a-johns (5 units) | $400–$600 |
| Water bottles + snacks | $300–$500 |
| Volunteer lunch | $200–$300 |
| Printed materials/maps | $150–$250 |
| Forge supplies, straw, corn, candles | $200–$400 |
| Total | ~$2,150–$3,250 |
Phase 1 — Coordination & Schools (Now – Aug 28)
School district liaison
- Confirm participating schools and grade (4th); get contact name + cell for each teacher/lead
- Get final attendance number confirmed in writing from each school (target: 600+ headcount incl. teachers/chaperones)
- Confirm each school’s arrival and departure window (stagger groups of ~100–150 across the morning)
- Distribute a one-page teacher packet to every classroom: map, schedule, parking/drop-off, what-to-bring, rain plan
- Get a signed permission/field-trip form template from each school if required
- Confirm transportation: bus drop-off loop, bus parking area, rain contingency for buses
Insurance & liability
- Confirm the association’s liability policy covers student field-trip events; request a certificate if the school board asks
- Confirm background-check requirements for volunteers (many districts require this — check with the schools)
Phase 2 — Program & Stations (by Sept 5)
Rotation schedule
- Build a rotation of 6–8 stations (~8–10 min each) so ~75–100 kids cycle through in ~75 min
- With 600 kids, plan ~6 waves across the morning; ~110 min per group incl. transit/bathroom
Recommended hands-on stations
- One-Room Schoolhouse — slate boards, ink pens, recite a 1900 lesson, ring the bell
- Log Cabin — cooking on a wood stove, dip candles, churn butter
- Round Barn tour — implements, loft, the silo, "what is a round barn?" talk
- Blacksmith forge demo — kid-safe distance, small souvenir (hook or nail) to take home
- Wheat threshing / winnowing — kids help bundle and thresh
- Crosscut saw & log cutting — two-man saw, kids assist with a scaled-down version
- Corn shelling & hand-grinder — kids shell an ear of corn
- Antique tractor display & "turn-the-crank" station — tractor parade at end of each wave
Materials to prepare per station
- Station script/cheat sheet (what to say in 5 min)
- A station lead + 2–3 volunteers each (8 stations × 3 = ~24 volunteers minimum; aim for 30)
- All props prepped and staged (slate boards, chalk, ink pens, candles, churns, corn, straw, kid-safe saw)
- Take-home items for every child (~$1.50–2/kid → ~$1,200 budget)
Phase 3 — Logistics & Facilities (by Sept 12)
Site preparation
- Walk the grounds for safety: trip hazards, low branches, loose boards, wasp nests, standing water
- Mowing — grounds cut two days before
- Restrooms — confirm fairgrounds restrooms work; rent 4–6 port-a-johns + 1 ADA unit
- Hand-washing/sanitizer stations at every station and near food
- Electricity for forge blower, any demo, and the schoolhouse PA
- Drinking water — fill station or hand out water bottles; kids dehydrate fast in September heat
Parking & traffic
- Bus loop mapped and coned; greeter at the entrance to direct buses
- Bus parking area (off the visitor loop, not the kid grounds)
- Handicapped/teacher parking near the meeting point
- Signs out on Hwy 336: "School Day Event — Buses Enter Here"
Stations infrastructure
- Canopies or umbrellas for shade at each outdoor station
- Rain plan — identify what moves indoors (print shop, schoolhouse, round barn) and what cancels
- Trash cans at every station + dumpster staged
- First-aid station — central, staffed, with a licensed nurse/EMT if possible
Phase 4 — People & Communications (by Sept 3–10)
Volunteers
- Recruit 30+ volunteers — station leads, greeters, bus marshals, bathroom monitors, first aid, floaters
- Volunteer briefing meeting 1–2 weeks before — hand out scripts, schedules, maps, contact list
- Background checks completed for every volunteer (if district requires)
- Volunteer thank-you plan — lunch on-site, thank-you note after
Teacher/school communication
- Send final logistics packet to each school 10 days out: arrival/dismissal, bus map, station map, rotation, rain plan, lunch plan, what to wear, emergency contacts
- Confirm each school’s lunch plan — 600 kids eating in 1 hour needs a big grassy area or staggered rotation
Phase 5 — Food & Drink (by Sept 10)
For the kids
- Decide: sack lunches from home (simplest), catered box lunches, or a hot lunch station
- Set up a water/Gatorade station — budget ~600 bottles + extras for volunteers
- Snack station — apples or trail mix for kids who didn’t bring lunch
- Allergy coordination — ask schools to flag nut/gluten allergies; have labeled alternatives
For volunteers & teachers
- Volunteer lunch — simple sandwich/hot dog line, drinks, coffee for the early crew
- Teacher hospitality — coffee and a snack station for teachers/chaperones
Phase 6 — Curriculum & Take-Home (by Sept 10)
Materials
- Teacher pre-visit packet — vocabulary, history of the round barn, what life was like in 1900
- Post-visit packet — worksheet or writing prompt for back in class
- Take-home souvenir ordered and counted (1 per child + 50 extras)
- Passport / stamp card — every station stamps a card; full card earns a small prize or certificate
- Printed map for every group leader — stations, bathrooms, first aid, assembly point
Phase 7 — Final Week (Sept 10 – Sept 16)
Final prep
- Final headcount from every school; confirm bus count
- Final volunteer roster locked; every station has a lead + backup
- Weather watch — confirm rain plan, decide cutoff time
- Site walkthrough 2 days before — all stations staged, props in place, signs up
- Forge lit and tested the morning of Sept 16
- Restrooms/port-a-johns delivered (1–2 days before)
- All stations labeled with big numbers (1, 2, …) so teachers can follow the map
- First-aid kit stocked; emergency contact list printed
- Group text thread for all volunteers the night before; final huddle time confirmed
- Volunteer briefing the evening before or 7 AM the morning of — all leads walk their stations
Phase 8 — Day-of, Thursday Sept 17
Setup (6:30 – 8:30 AM)
- All station leads arrive by 6:30
- Stations staged, props set, canopies up
- Forge lit and banked by 7:30
- Restrooms stocked, water stations filled
- First-aid station open by 7:30
- Greeters and bus marshals at the entrance by 8:15
- Volunteer huddle 8:15 — prayer/welcome, schedule, safety reminders
- Final radio/phone check for all leads
Operation (9:00 AM – 1:00 PM)
- First bus wave greeted at 9:00; assign a greeter guide to each bus group
- Groups rotate on the 8–10 min schedule; a floater watches the clock and signals moves
- Tractor parade at end of each wave (small antique tractor loop)
- Bathroom monitor replenishes tp/sanitizer hourly
- Trash sweep every 45 min
- Water station restocked mid-morning (10:30)
- Lunch wave — rotate schools through lunch area to avoid crush
- First-aid log kept; any incident documented and reported to the school
- Photographer captures 2–3 stations per wave for newsletter and Facebook (with school permission)
Dismissal (12:30 – 1:00 PM)
- Last wave wraps by 12:30
- Buses loaded by 12:45; depart by 1:00
- Each kid gets their take-home souvenir at the exit
- Lost-and-found table at the exit; teachers check it before leaving
- Board member greets each bus and thanks the teachers
Teardown (1:00 – 2:30 PM)
- Stations broken down; props packed and labeled
- Trash hauled
- Forge banked and cooled
- Port-a-johns scheduled for pickup the next day
- Volunteer thank-you lunch/snacks served
- Quick debrief — what worked, what to change for 2027
Phase 9 — After the Event
Follow-up
- Thank-you letters to schools, teachers, bus drivers, and volunteers
- Photos to schools for their newsletters/yearbooks
- Newsletter feature in the October issue (thank-you to donors and grantors)
- Debrief at the next monthly meeting; lock the 2027 School Days date
- Inventory — remaining supplies counted, props stored for next year
- Expenses reconciled against any school district or grant funding
Tip: use your browser's print dialog to save as PDF or print on paper. Checklist boxes are left blank for handwriting.